Multi-Unit Apartment Development
The Engineering Challenge
Executing a plumbing infrastructure for a 47-unit apartment complex requires exact mathematical precision. In Ado-Ekiti, the client's vision was a modern, luxury finish characterized by zero visible pipework. This required complex shaft routing and careful integration of central water heating systems to ensure identical, high-pressure water delivery to the top floors as well as the ground levels.
The Olaas Blueprint
Our engineering team developed a robust distribution network utilizing primary plumbing shafts. By integrating high-grade concealed cisterns (hidden water tanks) and conduit shower mixers early in the masonry phase, we established a seamless blueprint for the finishing team. The central water heating system was strategically calibrated to minimize heat loss across the extensive pipe network.
Project Scope
- Installation of 47 luxury bathroom units.
- Integration of concealed cisterns (hidden water tanks).
- Precision conduit shower mixer installations.
- Central water heating system deployment.
- Vertical plumbing shaft connections.
- Site-wide water distribution network layout.
- Multi-stage testing and system commissioning.
The Transformation
Site Angles & Details